Low Volume Production

  • No production run is too small, current projects range from 20 to 5,000 per annum.
  • Aluminium and P20 tooling manufactured in our group toolroom.
  • Use of hand loaded inserts for cost effective side core actions.
  • Post mould machining for cost effective side actions of gate removal.